E-Lite

Project Name:
E-Lite
Location:
6 Of October
Clint:
P&G
Consultant:
Shaker Consultant Group &Samy Negm Consult engineers
Project Activity

General Electro Mechanicals items
HVAC &Firefighting & Electrical
• Installation of 5 nrs. A.H.U for five lines
• Supply and install of duct systems with Dampers & Flexible connections & Grilles & Supports & thermal insulation and aluminum cladding
• Supply and install of HVAC control systems
• Supply and install of M.C.C Panels
• Supply and install of variable speed drives
• Installation of CHILLER including all accessories & piping and valves
• Installation of PUMPS including all accessories & piping and valves
• Installation of COOLING TOWER including all accessories & piping and valves
• Supply and install of Expansion Tank with all accessories & piping and valves
• Supply and install of C/S chilled water piping with valves & Flushing & Chemical cleaning and necessary fittings
• Install & Test and Connect with all accessories of Transformer 2500/3250 KVA
• Install & Test and Connect with all accessories of Ring Main Unit
• Supply &Install & Test and Connect with all accessories of Power Panel’s
• Supply and install of Electric Cable trays & Conduits works .and necessary fittings
• Supply and install Cables Networks &Wiring for power and control systems
• Supply and install Earthing system calculations and execution
• Supply and install Indoor and outdoor Lighting systems
• Supply and install of Sockets and Switches
• Supply & install and Test of Firefighting C/S Piping system included Valves & Sprinkler & Fire Extinguisher and Hose Rack Cabinet
• Supply and install of fire alarm system