Shipping Dock Extension

portfolio
Project Name:
Shipping Dock Extension
Location:
6 Of October
Clint:
P&G
Consultant:
Samy NEGM For F/F System work Prof Dr Metwally Abu-Hamd , For St/St Work Prof Dr m. El-Zanaty , For St/St Work
Project Activity

Civil and Steel Structure Works
• Excavation and footings
• Concrete paving works.
• Concrete Basements ( Plain and Reinforced )
• Slab on Grade
• Steel structure works.
• Stairs, Hand rails.
• Steel doors ( slide & hinged ) and frames
• High speed doors H.S.D
• Sandwich Panels Cladding
• Painting works.
General Civil and Architectural items
• Floor epoxy painting works
• Brick Wall & Plastering & Painting & Ceramics
• Utilities Works ( Plumping )
Fire Fighting Systems
• Supply & install and Test of Firefighting C/S Piping system included Valves & Sprinkler & Fire Extinguisher and Hose Rack Cabinet
• Supply and install of fire alarm system
Electrical Work
• Supply &Install & Test and Connect with all accessories of Power Panel’s
• Supply and install of Electric Cable trays & Conduits works .and necessary fittings
• Supply and install Cables Networks &Wiring for power and control systems
• Supply and install Earthing system calculations and execution
• Supply and install Indoor and outdoor Lighting systems
• Supply and install of Sockets and Switches

• Install all Process equipment’s
Included all mechanical & Controls and electrical connections and testing and commissioning