About Project

General Electro Mechanicals items
• Install and Connect of 4 T/Hr BOILER
• Install & Connect and Test of 4 m3 director tank
• Relocation and Modification of old STACK
• Supply & install and Test of C/St Boiler Piping (Schedule 80 ) with Valves & Flushing & Supports & thermal insulation and Aluminum cladding
• Supply & install and Test of Softener Station
• Fabricate & install of Boiler Platform

• Supply and install of Electric Cable trays & Conduits works .and necessary fittings
• Supply and install Cables Networks &Wiring for power and control systems

• Supply &Install & Test and Connect with all accessories of Power Panel’s