Extension Of Thee Packing Building
IN Detergents Factories
Investor Name:
Extension Of Thee Packing Building
Published Date:
January 1, 1970
Location:
6 Of October
Value:
P&G
Architecture:
Consulting Engineering Company
About Project
Steel structure building 40m*12m*14m With 2 levels
• Civil and Steel Structure Works
• Excavation and footings
• Concrete paving works.
• Concrete Basements ( Plain and Reinforced )
• Slab on Grade
• Steel structure works.
• Stairs, Hand rails.
• Steel doors ( slide & hinged ) and frames
• High speed doors H.S.D
• Sandwich Panels Cladding
• Painting works.
General Civil and Architectural items
• Floor epoxy painting works
• Brick Wall & Plastering & Painting & Ceramics
• Utilities Works ( Plumping )