Nesquick Extension
IN Industrial food & Medicine Factories, Major Projects
Investor Name:
Nesquick Extension
Published Date:
January 1, 1970
Location:
6 Of October
Value:
Nestle
Architecture:
Hewedy Consultants
About Project
Nesquick Extension Building
Concrete building with 2 floor ( 130 m2 ) Civil Works
• Excavation and footings
• Concrete works
• Concrete structure for the building
• Missionary works
• Plaster works
• Slab on grade
• Tiles and insulation
• Utilities Works ( Plumping )
• Aluminum Works (Windows & Doors & Partition )
Painting
Ceramic ( floor and wall tiles )
Steel doors and frames
Marble and granite
• Electrical system installations
• Indoor, Outdoor Lighting & Power systems