Project Name:
Location:
Clint:
Consultant:
Project Activity
General Electro Mechanicals items
• Supply and install of duct systems with Dampers & Flexible connections & Grilles & Supports & thermal insulation and aluminum cladding
• Supply and install of C/S chilled water piping with valves & Flushing & Chemical cleaning and necessary fittings
• Supply &install & Test & Control and Balancing of FANCOIL Units with piping and valves and all accessories
• Supply and install of Electric Cable trays & Conduits works .and necessary fittings
• Supply and install Cables Networks &Wiring for power and control systems
• Supply and install Indoor and Lighting systems
• Supply and install of Sockets and Switches
• Supply and install of Telephone Outlets System
• Supply and install of Data Outlets System
• Supply &Install & Test and Connect with all accessories of Power Panel’s
• Supply & install and Test of Firefighting C/S Piping system included Valves & Sprinkler & Fire Extinguisher and Hose Rack Cabinet
• Supply and install of fire alarm system