Procter & Gamble

E-Lite

A landmark project executed by AL-HAZEM Contracting, reflecting our commitment to excellence, precision, and reliability in every phase of construction.
This achievement stands as a testament to our engineering expertise, quality standards, and dedication to delivering projects that exceed expectations.

Clients

Procter & Gamble

Consultant

Shaker Consultant Group &Samy Negm Consult engineers

Location

6th of October city, Egypt.

Project Photo

Project Activity

General Electro Mechanicals items
HVAC &Firefighting & Electrical
• Installation of 5 nrs. A.H.U for five lines
• Supply and install of duct systems with Dampers & Flexible connections & Grilles & Supports & thermal insulation and aluminum cladding
• Supply and install of HVAC control systems
• Supply and install of M.C.C Panels
• Supply and install of variable speed drives
• Installation of CHILLER including all accessories & piping and valves
• Installation of PUMPS including all accessories & piping and valves
• Installation of COOLING TOWER including all accessories & piping and valves
• Supply and install of Expansion Tank with all accessories & piping and valves
• Supply and install of C/S chilled water piping with valves & Flushing & Chemical cleaning and necessary fittings
• Install & Test and Connect with all accessories of Transformer 2500/3250 KVA
• Install & Test and Connect with all accessories of Ring Main Unit
• Supply &Install & Test and Connect with all accessories of Power Panel’s
• Supply and install of Electric Cable trays & Conduits works .and necessary fittings
• Supply and install Cables Networks &Wiring for power and control systems
• Supply and install Earthing system calculations and execution
• Supply and install Indoor and outdoor Lighting systems
• Supply and install of Sockets and Switches
• Supply & install and Test of Firefighting C/S Piping system included Valves & Sprinkler & Fire Extinguisher and Hose Rack Cabinet
• Supply and install of fire alarm system

• Supply and install Cables Networks &Wiring for powerand control systems
• Supply and install Earthing system calculations and execution
• Supply and install Indoor and outdoor Lighting systems
• Supply and install of Sockets and Switches
• Supply & install and Test of Firefighting C/S Piping system included Valves & Sprinkler & Fire Extinguisher and Hose Rack Cabinet
• Supply and install of fire alarm system
• Supply & install and Test of Compressed Air and Hals (St/St) Piping system included Valves
• Supply & install and Test of Acid (St/St) Piping system included Valves
• Supply & install and Test of Steam & Condensate & Hot Water & Waste water & Chilled Water and Drinking (C/S) Piping system included Valves
• Supply & install and Test of CVC and Dust (C/S) Piping system included Valves

• Supply & install and Test of Duct and Shuts (C/S) system
• Install all Process Equipment’s Included all mechanical & Controls and electrical connections and testing and commissioning
*Level 00
1. Grinders
2. Bucket elevator
3. Fluid Bed cooler
4. HLAS Skid Unit
5. Hot water skid unit
6. Chilled water skid Unit
*Level 4.6
1. Paddle Mixers
2. Surge bins
3. Exhaust fans
4. Dehumidifier Unit
*Level 9.1 *Level 13.1
1. Screw feeder 1. Filters
2. Mogensen spreader 2. Chiller
3. Cage Mill
4. Belt convyor

More Photo...