Project Activity
Erection of Corrugated steel Cladding “24000 m2”
• Included:
o Flushing
o Rain Gutter
o Louvers
• Erection of Hand rails “2750 ML”
• Erection of Steel Structure 3000 Ton.
o Scrapyard building
o Ferroalloy building
o Warehouse workshop building
o Pump room building
o Compressed air plant building
o Fluid general system – pipe racks
• Fabrication and erection of piping Network (Carbon Steel & St/St) with different size (32″ to 2)” included supports, Valve’s, hydro test, NDT. With total QTY (140 TON)
• Assemble and erection of overhead cran’s (QTY 26) with different capacity with total QTY 1030 Ton.
• Scrap Yard.
• Metal shop general Equipment & auxiliaries.
• Continuous Casting machine.
• Rolling Mill Plant.
• Billet handling crane (QTY 13).
• Water Treatment Plant.
• Cranes for other areas.
• Erection of floor operated EOT crane-10m span for additive stores.
• Erection of floor operated EOT crane-10m span for lime stores.
• Erection of floor operated EOT crane-10m span for repair shop.
Fume Degusting Plan
o Erection of primary water-cooled duct group.
o Erection of EAF primary water-cooled duct supporting structure.
o Erection of settling chamber group.
o Erection of mobile duct on board system.
o Erection of secondary simple wall duct group.
o Erection of EAF primary S.W. duct supporting structure.
o Erection of simple wall duct group.
o Erection of EAF secondary S.W. duct supporting structure.
o Erection of axial cyclone group.
o Erection of axial cyclone structure group.
o Erection of the bag filter structure + walkways + stairs.
o Erection of the bag filter body (compartments / hopper / head frames)
o Erection of the bag filter cover.
o Erection of the bag filter commercialparts.
o Bag filter pneumatic plant.
o Erection of an electric hoist.
o Erection of the filter side enclosure.
o Erection of bag filter hoppers fluidization.
o Unloading & storing of bag filter comm. Parts for commissioning.
o Erection of filter plenum duct.
o Erection of fire group.
o Stack delivery.
o Delivery of duct supports.
o Erection of motors covering group.
o Erection of dust stocking bin group.
o Erection of dust stocking bin supporting structure group.
o Erection of dust suction pelletizing group.
o Erection of ladle furnace duct gr.
o Erection of support structures.
o Erection of valves / dampers / actuators gr.
o Erection of pneumatic valve dn 3000.
o Erection of valves / dampers / actuators gr.
o Erection of field instrumentations gr.
o Erection of dust conveying system.
o Erection of EAF main fans.
o Erection of ladle furnace booster fan with motor.
o Erection of Silo booster fan group.
o Erection of equipment’s & material for safety.
o Unloading & handing over of spare parts 2 years.
o Unloading & handing over of spare parts 2 “E” ” 057 “
o Erection of plants in strum. For degusting sys.
o Erection of plant comp. For degusting sys.
o Erection of nameplates & execution of paint for the fume plant.
o Erection of dust stocking bin supporting structure group.
o Erection of dust pelletizing group.
o Erection of pellets recovering casing.
o Erection of pellets hopper group.
o Erection of dust suction pelletizing group.
o Erection of comp. pelletizing gr.
o Erection of Daniella Automation.
o With Total QTY (1447) Ton.